MPH Building Systems

About MPH Building Systems

This author has not yet filled in any details.
So far MPH Building Systems has created 9 blog entries.

May 2023

August 2022

June 2022

June 2019

PV Panels on Modular Build

2023-11-22T10:32:39+00:00June 18th, 2019|Categories: Completed Projects|

Using PV Panels to Power A Modular Building MPH Building Systems recently designed and installed an energy efficient tennis pavilion for one of our clients. We combined a number of energy-saving techniques including adding photovoltaic (PV) panels to the modular roof. The aim of the project was to create an exciting, sports-orientated space which [...]

February 2019

October 2018

Recent Completion Of 2 Storey Modular Extension

2023-03-08T14:36:09+00:00October 29th, 2018|Categories: Modular Buildings|Tags: , |

Here is another recently completed two-storey modular school extension. With a school growing in capacity, a larger dining hall was required to cater for increased pupil numbers at meal times. In addition, the extra space is planned to provide flexibility and additional teaching facilities. Our 2 Storey School Extension Brief The original plans were [...]

October 2017

Improving and Extending Modular Classroom

2022-07-07T11:47:57+01:00October 11th, 2017|Categories: Modular Buildings|Tags: , |

Extending and Refurbishing a Modular School Building MPH Building Systems have recently completed the extension and refurbishment of an existing modular classroom. The school was growing from a one-form to a two-form entry school and one effective way of gaining additional classroom space was remodelling and extending the existing modular classroom. MPH Building Systems demonstrated [...]

May 2017

The Barn – Bespoke Modular Timber School Building

2023-03-08T15:57:13+00:00May 8th, 2017|Categories: Modular Buildings|Tags: , , |

MPH Building Systems have recently completed another bespoke education building. The bespoke design included exterior cedar cladding and an insulated thermal cladding system to give the building a more traditional appearance. Architects Specify Timber As A Preferred School Building Cladding System Architects are increasingly specifying timber as a preferred cladding system due to [...]

April 2017

Supply, Delivery And Installation Of A New Preschool

2023-11-22T10:37:00+00:00April 12th, 2017|Categories: Education Services, Modular Buildings|Tags: , , |

MPH completed the supply, delivery and installation of a new preschool. The complete turnkey package included site management, access, foundations, site services, drainage and landscaping.

Go to Top