When Hochtief Construction were faced with a monster construction project at Loch Ness, MPH uncovered the answers in the hunt for a temporary site accommodation solution
IoW Primary Care Trust
MPH Case Studies2017-01-30T12:50:02+00:00When St Mary’s Hospital prescribed the need for a peaceful, calming environment to operate as a refuge for doctors on call, MPH initiated a rapid response in the shape of a bespoke modular building solution
Waterloo Surgery
MPH Case Studies2017-01-30T12:50:03+00:00When the old Waterloo surgery became the casualty of a healthcare redevelopment project, MPH came to their aid with a temporary bridging solution
St Mary’s Hospital
MPH Case Studies2017-01-30T12:50:04+00:00When St Mary’s Hospital diagnosed a critical problem within their existing renal dialysis unit, the remedy consisted of a tailor made accommodation solution from MPH



