About MPH Case Studies

This author has not yet filled in any details.
So far MPH Case Studies has created 29 blog entries.

October 2015

Prefabricated modular buildings

2017-05-05T12:03:35+01:00October 29th, 2015|Categories: Modular Buildings, Offsite Modular Construction|Tags: , |

A construction project in Norway using prefabricated modular buildings caught our eye – and gave us an idea for our next holiday destination! The new adventure and exploration resort by architect Snorre Stinessen on Manshausen Island off the coast of Northern Norway features prefabricated portable cabins, cantilevered over the coastline. Offsite modular [...]

March 2014

8 classroom two storey teaching block at Furze Platt Senior School

2017-05-05T12:03:35+01:00March 25th, 2014|Categories: Case Studies|Tags: , , |

When the Mathematics Department at Furze Platt Senior School calculated a shortfall in the ratio of classroom space to student numbers, MPH Building Systems provided the answer with a modular construction two storey teaching block. Entering the equation at an early key stage, MPH project designers drew up plans for a new modular building to [...]

July 2013

Latest two storey modular building

2017-05-05T12:03:36+01:00July 19th, 2013|Categories: Uncategorized|

At 180.0 square metres, our latest stock two storey modular building comprises 10 no. 3.000 x 6.000m bays. Arranged in a 3 on 7 configuration (seven bays at ground floor level, three bays at first floor), the overall building footprint measures 21.000 x 6.000m. For sites bound by confined space or restricted access, the flexibility [...]

2012: A year in review (Part 3)

2017-05-05T12:03:37+01:00July 3rd, 2013|Categories: Company News|

Welcome to the final part of our look back throughout our 40-year anniversary celebrations in 2012. This article follows on from our the previous article 2012: A Retrospective (Part 2). Prior to Christmas, as the anticipated seasonal demand for bed spaces at London’s King’s College Hospital in London steadily increased, MPH were tasked with providing [...]

March 2013

Going Green and the impact on modular building design…

2017-05-05T12:03:40+01:00March 12th, 2013|Categories: Environmental Benefits|

As UK construction standards evolve to improve long-term renewable energy performance, here at MPH we monitor developments in Building Regulation legislation on an ongoing basis to assess the impact on our modular building systems. At the forefront of the industry, our project team constantly evaluate the latest green technologies available on the market to investigate [...]

February 2013

The day our new classroom arrived!

2017-05-05T12:03:42+01:00February 8th, 2013|Categories: Company News, Completed Projects|

We recently completed a modular design and build project for Kilby St Mary’s School. On the day of installation there was a great buzz of anticipation as, from the safety of the existing school, the young children excitedly watched the building being delivered and lifted into position. So delighted were they with their new modular [...]

Rabbsfarm Primary School

2017-05-05T12:03:43+01:00February 7th, 2013|Categories: Testimonials|Tags: , , |

I would like to express my gratitude to you and your company for the installation of three mobiles and the relocation of a fourth one as part of a rebuild process of our school. It was a massive undertaking to be carried out in an ever-shrinking timescale and it is to the credit of all [...]

May 2012

New Modular Building – Browning House – Lovely Jubilee

2017-05-05T12:04:57+01:00May 10th, 2012|Categories: Completed Projects, Modular Buildings|Tags: , |

New Modular Building formal opening by HRH Princess Anne at Browning House Jubilee Centre As the Queen presided over the State Opening of Parliament today, we reflect on a royal occasion in the MPH calendar as we recently attended the formal opening of our new modular buildings by HRH Princess Anne at the Browning House [...]

March 2012

Princess Anne’s Jubilee Visit Leeds To Celebration

2017-05-05T12:05:00+01:00March 30th, 2012|Categories: Completed Projects|

Our recently completed project to supply a two-storey family assessment centre at Browning House in Leeds is being formally opened by HRH the Princess Royal on Monday 2nd April 2012. Named the Browning House Jubilee Building in recognition of their 60th year anniversary, the occasion also coincides with MPH’s own 40th birthday celebrations. Established in [...]

December 2011

City of Stoke-on-Trent Council

2017-05-05T12:05:05+01:00December 2nd, 2011|Categories: Testimonials|

MPH Building Systems were the successful tender to supply a double classroom modular building at Sutherland Primary School, in Stoke on Trent. The service received from MPH was excellent and of high quality. MPH where given an extremely difficult timescale to site the building. They handled this in a most professional way and worked with [...]

Go to Top