01484 430518 Email MPH

Construction Site Temporary Buildings, Scotland – Hochtief At Loch Ness

Construction Site Temporary Buildings, Scotland – Hochtief At Loch Ness

When Hochtief Construction was faced with a monster construction project at Loch Ness, MPH uncovered the answers in the hunt for a temporary site accommodation solution.

Looking for construction site temporary buildings in Scotland? Please take a look at our project for Hochtief at Loch Ness. With the site headquarters for the new hydro-electric dam venture nestled on the picturesque banks of Loch Ness, MPH was presented with a unique and challenging project during an unforgiving winter in the Scottish Highlands.

Skills Needed:

Categories:

Hochtief’s Construction Site Temporary Buildings in Scotland – The Details

Assigned the task of providing 1600m² of site accommodation to house the main contractor and engineers for the duration of the construction works; the design team drew up plans to accommodate both new buildings manufactured to order and refurbished buildings adapted from existing stock units.

A detailed site survey was carried out. A design proposal was agreed upon, with the accommodation divided between the main site complex located on the shores of the loch and an additional satellite office situated on an isolated mountain plateau.

For the construction team, negotiating an access route for delivering the remote satellite office involved transporting the units via a specially constructed road, winding seven miles into the mountainside.

At 345m², the purpose-built satellite office was designed and manufactured by MPH to meet the client specification. Due to the exposed site location, the roof was reinforced to withstand increased snow loadings, whilst insulation levels throughout the building were increased to help combat potentially extreme temperatures.

As a result of utilising available buildings from stock, the initial phase of accommodation for the main office complex was installed on-site within just four weeks from placement of the order, assisting the client in controlling costs and bringing the building programme in on budget and on time.

Comprising four separate buildings, the main complex contained a two-storey contractor’s office (720m²), a single storey site engineer’s office (316m²), a canteen block (144m²) and a first aid room (86m²).

Further Case Studies

Explore other Case Studies we’ve completed across a range of sectors.

Enquire About Your Project Or Request Details About This Project

Case Study Contact Form

Would you like us to send you a PDF copy of this project?

Bring Your Modular
Vision to Life

Enquire today to explore a solution to your modular project or request a downloadable copy of this project for further consideration.