MPH were called to Frimley Park Hospital to deliver a 26-bed two-storey modular decant ward within a demanding timescale
Hope Hospital
MPH Case Studies2017-01-30T12:50:00+00:00When Hope Hospital needed to locate a new Walk-in Centre, MPH led the way with a complete design and build modular solution
IoW Primary Care Trust
MPH Case Studies2017-01-30T12:50:02+00:00When St Mary’s Hospital prescribed the need for a peaceful, calming environment to operate as a refuge for doctors on call, MPH initiated a rapid response in the shape of a bespoke modular building solution
Waterloo Surgery
MPH Case Studies2017-01-30T12:50:03+00:00When the old Waterloo surgery became the casualty of a healthcare redevelopment project, MPH came to their aid with a temporary bridging solution
St Mary’s Hospital
MPH Case Studies2017-01-30T12:50:04+00:00When St Mary’s Hospital diagnosed a critical problem within their existing renal dialysis unit, the remedy consisted of a tailor made accommodation solution from MPH




