
Peakirk Cum Glinton Pre School, Peterborough
We delivered a new pre-school facility to a school in Cambridgeshire. The design included brightly coloured play zones that are perfect for young children. This project was delivered during the 6-week school holidays to minimise disruption to the main school.

Off Site Construction Delivers Innovative Modular Building
MPH Building Systems recently designed and delivered an off site modular construction project for a school and community space in Lincolnshire, combining innovative design with modern construction methods. A building that doubles as a facility for local businesses and community groups to enjoy.
Modular Classrooms In Lincolnshire
We recently completed construction of a two-storey modular classroom block for a school in Lincolnshire. This will provide 8 new state-of-the-art classrooms as well as a double-height atrium area for group work. The school are delighted with their new facility!
Modular School Extension
Working with a school for children with special educational needs (SEN), MPH were able to build an extension to their existing dining hall facilities. Our modular building project was completed in just a few weeks, providing additional capacity for school lunchtimes.

Batley Girls High School Modular Science Block & Classrooms
Batley Girls' High School needed an additional five English teaching classrooms and two Science teaching laboratories. We constructed two separate buildings; one adjacent to the existing English department and another to house the new science labs.
School Library
A local high school was looking to add a new school library building to free up classroom space in the main school. The challenge was to install the new building with limited access to the site. We lifted the modular sections of the building using a crane.
Limehurst Academy
The brief was Limehurst Academy required more teaching space to meet the needs of an expanding school. Under a challenging programme, the facility had to be completed and ready for a grand opening day introducing the building to the new student intake before the school closed for summer.
Spenborough Fitness Suite
Kirklees Active Leisure (KAL) gymnasium and health club was left in tip-top condition after MPH Building Systems completed a major upgrade of a facility at the heart of its community.
Weston Green School
Theo Paphitis, a doyen of the BBC’s popular Dragons’ Den show, made it his business to unveil the new classrooms at Weston Green school in a project that showcased MPH’s proficiency in the education sector.
Fairfield Community Primary School
MPH were on hand to provide a quick solution when it was confirmed that the age range of Fairfield Community Primary School would expand to accommodate an additional year group of thirty pupils.
Wilmcote Primary School
MPH received a glowing report from school governor Roger Harrison when evaluating their work on this complex project.
Furze Platt Senior School
When the Mathematics Department calculated a shortfall in the ratio of classroom space to student numbers, MPH provided the answer with a modular construction two storey teaching block








