Refurbished Portable Cabin Converted To Eco Classroom

Refurbished Portable Cabin Converted To Eco Classroom

Project Description

MPH was awarded a contract to supply a new woodland classroom for a Blackpool Academy school and fulfilled the brief with a refurbished cabin. A renewed, bespoke, wood-look refurbished modular cabin in Lancashire was completed to the highest standards, providing considerable cost savings.

Marketing Suite To Classrom Conversion - Eco Pod

Refurbished Cabin Transformed To An Eco Classroom Pod In Lancashire For Blackpool Academy

The community academy in Blackpool required an eco pod upon a site that was difficult to access in a very short timescale. The solution was to customise a unit from our cabin stock and convert this into a modular classroom building.

The eco cabin classroom in Lancashire showcases a sustainable and cost-effective building. We successfully delivered this bespoke educational space to seamlessly align with the project’s budget, environment and designated timescale through the innovative use of a recycled and renovated prefabricated unit from our modular stock.

Explore more about this project below.

Park View Community Academy New Classroom Side Rear Fire Door After

The Architect’s Brief

A Sustainable Eco Pod Designed With Nature In Mind Crafted On-Time, Within Budget

The classroom building at Park Community Academy was required as part of a wider strategy to develop other buildings across the school grounds. The classroom provides the additional classroom space to support the school during these works and is also located within their wildlife areas to facilitate classes that have a focus on nature and biodiversity.

The refurbished unit offered a more cost effective and high quality outcome than a new classroom. The modular method of construction meant that the process had minimal disruption on the school and could be delivered and installed within the school holidays.

The school are delighted with the final outcome which provides plenty of storage, lots of natural light and a modern clean finish. The whole process was well orchestrated with constant communication throughout the process and MPH worked hard to help us achieve a high quality learning environment in a short space of time

– Architect, Park Community Academy

Blackpool Modular Construction Crane Installation

Overcoming Construction & Installation On A Constrained Site

We overcame difficult access issues at the build location through offsite construction and crane installation. The intended classroom site was located within a constrained area of woodlands, and the refurbished modular classroom was not accessible for articulated vehicles.

We carefully planned logistics, partnering with our crane and haulage contractors to offer a solution. Together, MPH and our haulage and crane contractors formulated a plan to lift the prefabricated components from a location over 45m away. This solution met health and safety compliance requirements and ensured a fast installation and build schedule within an inaccessible site.

The refurbished prefabricated eco classroom in Lancashire is a sustainable and cost-effective solution to both budget and access constraints.

Converting Disused Cabins Into Classrooms

We entirely redesigned and reconstructed a former marketing cabin building and refabricated it bespoke to the Academy’s specifications. Complete with a classroom, kitchen, and toilet facilities, the new modular construction in Blackpool underwent a full remodel, including a full internal and external refurbishment, as well as upgraded energy-efficient heating and lighting.

Timescale:6 weeks from order to site completion

See below the three stages of this fast-track, off-site, refurbished Lancashire modular classroom project.

Benefits Of Used Cabins For Modular Construction Projects

Converting A Used Cabin To A Classroom Building

Blackpool Modular Construction Refurb Woodland Classroom BEFORE MARKETING SUITE

Former Marketing Cabin Conversion To A Classroom

BEFORE

Repurposing disused prefabricated units like this former marketing suite is a cost-effective, sustainable solution for additional classrooms.

Blackpool Modular Construction Refurb Woodland Classroom Reassembly On Site

Remodel Then Reassemble Of Modular Classroom In Lancashire

REFURBISHMENT

We transform disused cabins by transporting them to our workshop, undertaking off-site upcycling fabrications, and then final renovations and reassembly with restored elements on site.

Composite Wood Cladding On Modular Classroom - Park View Community Academy New Classroom Side Exterior Decking After

The Refurbished Eco Pod Classroom In Lancashire

AFTER

Following the off-site transformation of the disused cabin, we transport and reassemble the renovated components to complete the project, in this case, a marketing suite to classroom conversion.

Composite Wood Cladding On Modular Classroom - Park View Community Academy New Classroom Side Exterior Decking After

The Result & Client’s Feedback

A Woodland Classroom Designed To Blend With Nature

The modular woodland classroom unit was externally encased with slatted composite cladding. This gave it a wood-look, highly durable exterior that matched the existing buildings while remaining sympathetic to the surrounding woodland area.

We are delighted with our new modular classroom which we have now named the Eco Pod.

The need for this additional building arose from the continued expansion of the school site and a specific redevelopment project on one of our existing buildings, meaning one of our classes required a new home for the duration of this project.

The new classroom has exceeded our expectations in terms of quality, finish and facilities within the unit.

The team from MPH have been easy to work with, communicated well and adhered to deadlines, along with understanding the needs of our school.

– Business Lead, Park View Academy

Refurbished Cabins & Converting Used Prefabricated Buildings Into Classrooms

The above project highlights our skill in bespoke educational spaces that seamlessly align with your project’s budget and designated timescale. For the academy above, we use a recycled and remodelled prefabricated unit from our modular stock. We specialise in fabricating and installing new and remodelled cabin buildingsfor temporary and permanent use and have worked with many schools and local authorities nationwide. Our experience enables us to solve every access, environmental or structural challenge and guarantee affordable, speedy on-site construction with minimal disruption.

Learn more about our buildings for education or other sectors, and get in touch to discuss your project.

Further Case Studies

Explore other Case Studies we’ve completed across a range of sectors.

Enquire About Your Project Or Request Details About This Project

Case Study Contact Form

Would you like us to send you a PDF copy of this project?

Bring Your Modular
Vision to Life

Enquire today to explore a solution to your modular project or request a downloadable copy of this project for further consideration.